Concrete
How long before I can drive on new concrete?
Light foot traffic is usually acceptable after about 24 to 48 hours. Most residential concrete should cure for at least seven days before regular passenger-vehicle traffic. Heavier trucks, cold weather, the concrete mix, slab thickness, and curing conditions may require additional time.
Project-specific advice matters: Site conditions, local requirements, weather, access, soil, loads, and selected materials can change the right answer for a particular property.